Dongguan Haide Machinery Co., Ltd.
Main products:Dock Leveler,Bucket,Long Reach Boom,Grab,Yard Ramp
Products
Contact Us
  • Contact Person : Mr. Zhang Peter
  • Company Name : Dongguan Haide Machinery Co., Ltd.
  • Tel : 0086-769-88708111
  • Fax : 0086-769-83350798
  • Address : Guangdong,Dongguan,Industrialarea,Tangxia Village,Gaobu Town,Dongguan,Guangdong,China
  • Country/Region : China
  • Zip : 523281

Hydraulic dock loading leveler

Hydraulic dock loading leveler
Product Detailed
Hydraulic dock loading leveler 1.Good welding,very durable 2.Power pack is Italy"Hydr-app" 3.Oil seal is Japan"NOK" 4.OEM

Hydraulic dock loading leveler

Dock loading leveler is installed in the pit of wearhouse,very convenient for forklift to load&unload cargos.

1.Powerpack is Italy"Hydr-app",Oil-seal is Japan"NOK"

2.Warranty: 1 year for all,3 years for steel structure

3.We can supply you spareparts for maintances

The parameter of our standard dock leveler as follow

We also can customize according to your requirements.

Model

Equipment Specification

W*L*H(mm)

Pit dimension

W*L*H(mm)

Capacity

Adjustable range

Lip board

W*L*T(mm)

HD-GTY6*6

1830*1830*490

1870*1680*500

3~25T

 

10T/15T is standard

+300mm/-300mm

1830*400*15

HD-GTY6.5*6

1980*1830*490

2020*1680*500

1980*400*15

HD-GTY7*6

2130*1830*490

2170*1680*500

2130*400*15

HD-GTY6*8

1830*2440*490

1870*2280*500(600)

1830*400*15

HD-GTY6.5*8

1980*2440*490

2020*2280*500(600)

1980*400*15

HD-GTY7*8

2130*2440*490

2170*2280*500(600)

2130*400*15

HD-GTY6*10

1830*3050*490

1870*2880*500(600)

+450mm/-300mm

 

If the height

Is 590mm:

+450mm/-350mm

 

 

1830*400*15

HD-GTY6.5*10

1980*3050*490

2020*2880*500(600)

1980*400*15

HD-GTY7*10

2130*3050*490

2170*2880*500(600)

2130*400*15

Voltage:

For hydraulic dockleveler:

1.200~465V,3P,50HZ/60HZ

2.190~250V,1P,50HZ/60HZ

For airbag dock leveler

1.190V~250V,1P,50/60HZ 

Marks:

1.For airbag dockleveler:the height is only 490mm

2.All of above specifications are our standard,if you need special dockleveler,give us the Pit-dimension or yours request,and we can do the right dockleveler

3.After 3~5 years after installation,for the maintenance,you can sent us the sparepart you need,we can prepare it for you 

Hydraulic dock loading leveler



Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.